-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueThe Sustainability Issue
Sustainability is one of the most widely used terms in business today, especially for electronics and manufacturing but what does it mean to you? We explore the environmental, business, and economic impacts.
The Fabricator’s Guide to IPC APEX EXPO
This issue previews many of the important events taking place at this year's show and highlights some changes and opportunities. So, buckle up. We are counting down to IPC APEX EXPO 2024.
Getting to Know Your Designer
In this issue, we examine how fabs work with their design customers, educating them on the critical elements of fabrication needed to be successful, as well as the many tradeoffs involved. How well do you really know your customer? What makes for a closer, more synchronized working relationship?
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - pcb007 Magazine
Driving Down Cost with Process Engineering
April 20, 2021 | I-Connect007 Editorial TeamEstimated reading time: 3 minutes
Nolan Johnson and Barry Matties speak with Matt Mack, a process engineer at ICM Controls. Matt shares how he’s driving down cost through continuous improvement. He also discusses planning for the future with automation and AI. Matt started with ICM Controls in 2019. Prior, he worked at Whelen Engineering (now GreenSource Fabrication) for about five years. His career in the PCB industry began at Sanmina.
Nolan Johnson: We’re interested in learning about your approach to process engineering. What’s your thinking for identifying processes that are in need of improvement?
Matt Mack: I start with our price per panels and the costs that are associated with it. I start to think, how can we make the process smoother, more efficient, where I don’t need to have as much human interaction with chemicals? That all starts with gathering data with chemical data. I’ll do titrations, for example. I’ll pick one line at a time that I will not have any dosing on, and I’ll calculate the square footage of panels through X amount of time, how much it dropped in concentration, and I’ll adjust dosing based on panel count. Then you have to optimize speed.
You can also do line speed, increasing or decreasing to optimize quality. I always strive for the 1.33 Cpk for the parts. It’s not always possible, but we come pretty close. It took about six months to really get dosing right. Right now, we do chemical analysis about twice a week. That’s much lower than recommended, but the data is not driving us to analyze it more. I asked our software guy to develop a chemical database that allows me to input the chemical data and track Cpk, track trends up and down, and in-spec/out-of-spec; if any of those rules are violated, it notifies me through an email.
Some of those are deemed critical, some are not. If any of it is deemed critical, we’ll trigger the production’s halt. If it’s not critical, we might be able to do it on the fly. For instance, let’s look at the copper concentration in a microetch. I might empty the line out before its formal dump, but it’s not going to impact quality on the product. Those are some of the rules that I observe. Any time you see a trend of five points decreasing, it could be a dosing issue, so I would jump right on the dosing, and verify it’s dosing what I’ve asked it to dose; second, maybe the chemical ran out and there’s an airlock. I get a lot of those emails where it’ll show you process control.
Matties: When you stand back as a process engineer and take that 30,000-foot view of a process, what do you want to improve to optimize it? What’s your process for doing that?
Mack: The first thing I monitor is speed. We track panels through and panels out. I would always start with asking: What are some of the slower ones, and how do I increase throughput on that piece of production? If you’re going to have funnels where, let’s say, the score machine is not putting out as many panels as the plating line, I might need to buy either a faster score machine or an additional score machine to maximize output. As we’re ramping up here, there is some capex equipment that we’re looking to quote in order to increase production on the floor. Generally, speed is what I look at.
The second thing would be chemical usage. If it costs us X to run one panel, what is the impact of that one piece of chemical on the panel? I look at price per panel by operation, as well. Can I get away with dosing less? For instance, for the pre-treat line, they recommended running something like 20 milliliters a panel. I actually optimized it to only run at about 8 milliliters. It saved us $18,000 over the course of a year. A lot of what drives me to look at process either optimizes panel production or price. Regarding price, for example, every six months I’ll review price per panel to determine where we can improve and where we can’t.
To read this entire interview, which appeared in the April 2021 issue of PCB007 Magazine, click here.
Suggested Items
Trouble in Your Tank: Supporting IC Substrates and Advanced Packaging, Part 5
03/19/2024 | Michael Carano -- Column: Trouble in Your TankDirect metallization systems based on conductive graphite or carbon dispersion are quickly gaining acceptance worldwide. Indeed, the environmental and productivity gains one can achieve with these processes are outstanding. In today’s highly competitive and litigious environment, direct metallization reduces costs associated with compliance, waste treatment, and legal issues related to chemical exposure. What makes these processes leaders in the direct metallization space?
AT&S Shines with Purest Copper on World Recycling Day
03/18/2024 | AT&SThe Styrian microelectronics specialist AT&S is taking World Recycling Day as an opportunity to review the progress that has been made in recent months at its sites around the world in terms of the efficient use of resources:
Matrix to Exhibit at IPC APEX EXPO 2024 in Anaheim, CA
03/05/2024 | MatrixMatrix will be exhibiting at IPC APEX EXPO 2024, to be held on April 9-12, 2024, at the Anaheim Convention Center, Anaheim, CA.
The Chemical Connection: Getting to Know Your Vendor
02/16/2024 | Don Ball -- Column: The Chemical ConnectionAfter working for a capital equipment supplier for almost 50 years, I’ve found that the most important part of getting to know your vendor is good communication among all parties. While contact between fabricators of a constantly changing product line and the designers of those products may occur daily or weekly, conversations between you and your equipment supplier may be years apart. That lengthy gap often means that previous contacts may have been promoted, retired, or moved on to other opportunities. You may have also migrated to a new supplier with whom you have little or no history. In either case, you will be interacting with someone you are unfamiliar with (as they are with you). Therefore, it is essential for both sides to communicate clearly so expectations will align.
EIPC Winter Conference 2024, Day 2: A Closer Look at Global Trends
02/14/2024 | Pete Starkey, I-Connect007The opening session of the second day’s conference proceedings focused on global PCB trends and was introduced and moderated by Dr. Michele Stampanoni, vice president of strategic sales and business development at Cicor Group in Switzerland. He opened the session with Dr. Hayao Nakahara’s knowledgeable and enlightening video presentation on the IC substrates industry.